Panel Load Check
We calculate your existing load before sizing the new circuit. If your panel is at capacity, we tell you upfront — no surprises on install day.
EV Charger Installs
Level 2 home charger installs done right — panel load check, correct breaker sizing, clean conduit run, and permit coordination if your jurisdiction requires it.
We check your panel capacity before anything else. You get an honest answer on whether you need a panel upgrade first or can install straight away.
Takes ~60 seconds. No spam.
A complete EV charger install — not just plugging in a unit.
We calculate your existing load before sizing the new circuit. If your panel is at capacity, we tell you upfront — no surprises on install day.
Most Level 2 chargers need a 50A circuit (40A continuous). We size it to match your charger and future-proof for faster charging upgrades.
Wire routed through conduit where exposed — clean, protected, and inspectable. Not just stapled through walls and hoped for the best.
Most jurisdictions require a permit for new circuits. We handle the coordination and know what inspectors look for so your install closes clean.